Author Topic: Turns 1 - 6  (Read 2787 times)

0 Members and 1 Guest are viewing this topic.

Offline Erik L (OP)

  • Administrator
  • Admiral of the Fleet
  • *****
  • Posts: 5654
  • Thanked: 366 times
  • Forum Admin
  • Discord Username: icehawke
  • 2020 Supporter 2020 Supporter : Donate for 2020
    2022 Supporter 2022 Supporter : Donate for 2022
    Gold Supporter Gold Supporter : Support the forums with a Gold subscription
    2021 Supporter 2021 Supporter : Donate for 2021
Turns 1 - 6
« on: October 15, 2015, 10:59:00 AM »
Fairly uneventful. Mostly a bit of research and construction. The crew training will give me a starting pool to draw from. Initial plans for the Iskaren is to survey Iskaren II and Iskaren XI. The two Eagle-class in the Exploration fleet will probably be shifted to the Defense Legion.

Turn 1
Collect income of 1471.47. Rolled 10 for EH. EH now 7. Adjusted income by +147.15.
Begin construction of training facility. 6/10 complete.
Begin research on Laser Tech I. Carry over 50RP from start. 95.5/100.
Lay down schematics for Iskaren-class Surveyor
Code: [Select]
621 tons, Sensor I, Alpha Armor, Prim Fission, Basic NT, Science Inst. FTL I.
Cost 8605, Sig: 31.05, Crew 57 (13 basic, 41 Eng, 3 Command)
Purchase 1 Iskaren. 100/621
Complacency is 10.

Turn 2
Collect income of 1471.47. Rolled 1 for EH. EH now 6. Adjusted income by +73.57.
Construction of Training Facility complete. Begin construction on orbital troop barracks (4/20).
Research roll 72. Continue research to next month.
Iskaren construction = 200/621.

Turn 3
Collect income of 1471.47. Rolled 10 for EH. EH now 7. Adjusted income by +147.15
Troop Barracks construction continues (14/20).
Research roll 64. Continue research to next month.
Iskaren construction = 300/621.

Turn 4
Collect income of 1471.47. Rolled 6 for EH. EH remains 7. Adjusted income by +147.15
Troop Barracks construction complete (20/20). One orbital slot remains.
Research roll 09. Research complete.
Iskaren construction = 400/621.
Initiate Fission II project (45.5/200).

Turn 5
Collect income of 1471.47. Rolled 2 for EH. EH drops to 6, mild downswing. Adjusted income by +73.57.
Research continues on Fission II. (91/200)
Iskaren construction = 500/621.
Train crew. Crew pools = Basic: 100, Command: 20, Engineering: 50.

Turn 6
Collect income of 1471.47. Rolled 2 for EH. EH drops to 4, major downswing. Adjust income by -73.57.
Research continues on Fission II. (136.5/200)
Iskaren construction = 600/621.
Train crew. Crew pools = Basic: 2100, Command: 60, Engineering: 200.