Author Topic: Stockpiled parts...  (Read 1187 times)

0 Members and 1 Guest are viewing this topic.

Offline Elvang (OP)

  • Able Ordinary Rate
  • E
  • Posts: 2
Stockpiled parts...
« on: September 27, 2011, 07:45:34 PM »
Do stockpiled parts get used for refits or when the design is built by construction factories (orbital habitat/pdc)?
 

Offline ZimRathbone

  • Captain
  • **********
  • Posts: 408
  • Thanked: 30 times
  • Gold Supporter Gold Supporter : Support the forums with a Gold subscription
    2021 Supporter 2021 Supporter : Donate for 2021
    2023 Supporter 2023 Supporter : Donate for 2023
Re: Stockpiled parts...
« Reply #1 on: September 27, 2011, 09:48:13 PM »
No - stockpiles are only used by new Shipyard construction
« Last Edit: September 27, 2011, 09:50:01 PM by ZimRathbone »
Slàinte,

Mike
 

Offline bringit133

  • Able Ordinary Rate
  • b
  • Posts: 4
Re: Stockpiled parts...
« Reply #2 on: September 27, 2011, 10:22:04 PM »
Someone correct me if I am wrong but I believe they speed up the rate at which the ship that would use those parts is built.
 

Offline Brian Neumann

  • Vice Admiral
  • **********
  • Posts: 1214
  • Thanked: 3 times
Re: Stockpiled parts...
« Reply #3 on: September 28, 2011, 05:05:33 AM »
Someone correct me if I am wrong but I believe they speed up the rate at which the ship that would use those parts is built.
I would need to check to see if this would cover refits to a new ship class (modernization) but IIRC it does.  The parts in your stockpile are reduced by whatever can go on a ship.  The ship is then considered to be that far along on the building of it and the remainder of the time needs to be put in by a shipyard.  A good example would be a military beam weapons escort.  I built the engines, weapons, fire controls, sensors, and power plant and put them in my stockpile.  When I started to build the ship it took all of those parts and added them to the ship under construction.  Said ship was now almost 80% complete so the remaining 20% was all it needed to actually build.  In this case the original build time was 20 months.  It actually took 4 months to build.  I have managed with a lot of prebuilding parts to make a 30,000 ton energy combatant in just 3 months when it would normally have taken almost 30 months. 

Hope this helps
Brian