Post reply

Warning: this topic has not been posted in for at least 120 days.
Unless you're sure you want to reply, please consider starting a new topic.

Note: this post will not display until it's been approved by a moderator.

Name:
Email:
Subject:
Message icon:

shortcuts: hit alt+s to submit/post or alt+p to preview

Please read the rules before you post!


Topic Summary

Posted by: Erik L
« on: October 15, 2015, 10:59:00 AM »

Fairly uneventful. Mostly a bit of research and construction. The crew training will give me a starting pool to draw from. Initial plans for the Iskaren is to survey Iskaren II and Iskaren XI. The two Eagle-class in the Exploration fleet will probably be shifted to the Defense Legion.

Turn 1
Collect income of 1471.47. Rolled 10 for EH. EH now 7. Adjusted income by +147.15.
Begin construction of training facility. 6/10 complete.
Begin research on Laser Tech I. Carry over 50RP from start. 95.5/100.
Lay down schematics for Iskaren-class Surveyor
Code: [Select]
621 tons, Sensor I, Alpha Armor, Prim Fission, Basic NT, Science Inst. FTL I.
Cost 8605, Sig: 31.05, Crew 57 (13 basic, 41 Eng, 3 Command)
Purchase 1 Iskaren. 100/621
Complacency is 10.

Turn 2
Collect income of 1471.47. Rolled 1 for EH. EH now 6. Adjusted income by +73.57.
Construction of Training Facility complete. Begin construction on orbital troop barracks (4/20).
Research roll 72. Continue research to next month.
Iskaren construction = 200/621.

Turn 3
Collect income of 1471.47. Rolled 10 for EH. EH now 7. Adjusted income by +147.15
Troop Barracks construction continues (14/20).
Research roll 64. Continue research to next month.
Iskaren construction = 300/621.

Turn 4
Collect income of 1471.47. Rolled 6 for EH. EH remains 7. Adjusted income by +147.15
Troop Barracks construction complete (20/20). One orbital slot remains.
Research roll 09. Research complete.
Iskaren construction = 400/621.
Initiate Fission II project (45.5/200).

Turn 5
Collect income of 1471.47. Rolled 2 for EH. EH drops to 6, mild downswing. Adjusted income by +73.57.
Research continues on Fission II. (91/200)
Iskaren construction = 500/621.
Train crew. Crew pools = Basic: 100, Command: 20, Engineering: 50.

Turn 6
Collect income of 1471.47. Rolled 2 for EH. EH drops to 4, major downswing. Adjust income by -73.57.
Research continues on Fission II. (136.5/200)
Iskaren construction = 600/621.
Train crew. Crew pools = Basic: 2100, Command: 60, Engineering: 200.