Posted by: sloanjh
« on: March 18, 2011, 08:45:18 AM »with a refit, youre credited the time spent in refit as also being spent in overhaul, if a ship spends 1 month in refit, the overhaul clock would be reduced by 4 months (IIRC). If your current overhaul clock is less than 4 months then that goes to 0. The refit doesn't force you to complete a full overhaul (although I frequently have both running as I usually bring ships in with the intention of refitting, and have them go into overhaul while waiting for a slip to open up)Good point - my bad.
Quote
I'd anticipate that the actual time spent in refit for this scenario would be whatever the length of interval you happen to run that engages the next production phase - likely around 5 days - could be up to 30 in you happen to run a long increment that doesnt get interupted, possibly less than 5 if you've been running short increments that havent triggered a production phase for a while.Yep - that's what I was trying to say.
John