Grandmaster Bruno Von Bucher and his Council have decided the first tasks ahead of the order are to be
Converting of Conventional Industry to TN Mines and Factories
Research into Pressurized water reactor which Stephanie Goldenberg*Power and Propulsion,20%,15 Labs* thinks will lead to an engine far superior to anything we could currently construct .
And then whatever is needed for the geological survey of the Sol System.
Jan 1 2150, Jana Rosndorf appointed Admin of Earth
20% Political
20% Factory
10% Wealth
10% Mining
15% Terra-forming
Little of Note takes place through the rest of 2150. Converted 40 Mines,26 Factories .
2151- Finished Pressurized Water Reactor. Goldenberg started research into Nuclear Thermal Engine Tech.
Started adding Capacity to Rheinmetal Shipyard.
2152-Expansion of Shipyard Finished
July-Nuclear Thermal Engine Tech finished. Research of an Engine Quickly started and finished. Geological Survey Sensors started.
At the start of 2153 the Order has 100 Factories,120Mines,5Labs and 880 CI left to convert.
March 2153- Geological Survey Sensors Finished.
With Sensor Research finished all the components needed for a survey of the Sol system are in place. This leads to the first space faring craft design.
Reconquista class Geological Survey Vessel 2,000 tons 45 Crew 325.7 BP TCS 40 TH 75 EM 0
1875 km/s Armour 1-14 Shields 0-0 Sensors 1/1/0/2 Damage Control Rating 1 PPV 0
Maint Life 3.78 Years MSP 102 AFR 32% IFR 0.4% 1YR 11 5YR 168 Max Repair 100 MSP
Intended Deployment Time: 18 months Spare Berths 0
25 EP Nuclear Thermal Engine (3) Power 25 Fuel Use 95% Signature 25 Exp 10%
Fuel Capacity 150,000 Litres Range 14.2 billion km (87 days at full power)
Geological Survey Sensors (2) 2 Survey Points Per Hour
This design is classed as a Military Vessel for maintenance purposes
Construction was started immediately.
Researched into improved construction methods started by Sylvia von Humbold*25%,20Labs*