Be careful with the cycle order.
There are issues with it on very short runs, like when the order-set is finished inside a single production cycle. Personally I don´t use it, because of the danger of setting up a run and then forgetting it, even long after that run is useful. Therefore I use the repeat X order with 10 or 20 repeats.